Regulation 28 report to prevent future deaths, reference 2024-0125, written 4 Mar 2024. A coroner writes one of these when an inquest reveals a risk that could cause further deaths unless something changes.

Date of report4 Mar 2024
Reference2024-0125
DeceasedVanessa Ford
CoronerIan Potter
Coroner areaInner North London
CategoryRailway related deaths
Sourcejudiciary.uk record · original PDF
Responses published2

The report

Text extracted from the PDF text layer. Reproduced verbatim, including the scan's own layout.

Regulation 28: Prevention of Future Deaths report 

Vanessa FORD (died on 23 September 2023) 

REGULATION 28 REPORT TO PREVENT FUTURE DEATHS 

THIS REPORT IS BEING SENT TO: 

Rail –

1. 

2. 

, Group Safety & Engineering Director, Network 

, Interim Chief Executive, London Borough 

of Hackney, 1 Hillman Street, London, E8 1DY 

1 

CORONER 

I am Ian Potter, assistant coroner for the coroner area of Inner North London. 

2 

CORONER’S LEGAL POWERS 

I make this report under paragraph 7, Schedule 5, of the Coroners and 
Justice Act 2009 and Regulations 28 and 29 of the Coroners (Investigations) 
Regulations 2013. 

3 

INVESTIGATION and INQUEST 

On 2 October 2023, an investigation was commenced into the death of 
VANESSA FORD, then aged 47 years. The investigation concluded at the 
end of an inquest, heard by me, on Monday 26 February 2024. 

The conclusion of the inquest was a short narrative conclusion, the medical 
cause of death being: 

1a multiple traumatic injuries 

4 

CIRCUMSTANCES OF THE DEATH 

On 23 September 2023, Vanessa Ford consumed a significant amount of 
alcohol while undergoing an acute mental health crisis. She accessed 

 and allowed herself to drop onto the 

railway tracks below, where she was later struck by a train. There is 
insufficient evidence to suggest that she intended to take her own life. 

5   CORONER’S CONCERNS 

During the course of the inquest the evidence revealed matters giving rise to 
concern. In my opinion, there is a risk that future deaths could occur unless 
action is taken. In the circumstances, it is my statutory duty to report to you. 

 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 The MATTERS OF CONCERN are as follows:- 

           To Network Rail, in particular: 

(1) I was provided with evidence that there have been three (non-fatal) 
incidents in the vicinity of the Hackney Central/Dalston Kingsland 
areas of the rail network in the 12 months prior to this incident on 23 
September 2023 (British Transport Police Post Incident Site Report 
DOCU Reference: DOCU 2023 1576 refers). 

. The concern here is that there is evidence to suggest that 

access to the railway tracks by members of the public may be a 
frequent issue in this vicinity. 

(2) Evidence provided from CCTV footage and photographic evidence 

taken by the British Transport Police demonstrated that the particular 
piece of wall, which was used to access the railway network on 23 
September 2023, was relatively low, despite an approximate drop onto 
the tracks below being 20 feet. The British Transport Police Post 
Incident Site Report sets out that the “Road over rail bridge has metal 
covers and hostile toppings on walls directly over the railway”; 

 This raises the concern that 
the mitigation/safety measures in place on the wall may not have been 
as effective as one might expect. 

(3) The CCTV footage and photographic evidence presented to me, 
demonstrated that Ms Ford’s access to the wall, and thereby the 
railway network below, 

. In their oral evidence during the inquest, 

the Officer from the British Transport Police confirmed their view, 
which I accepted, that this electrical box makes access to the wall 
much easier than it should be. They also confirmed that this issue is 
 and 
unlikely to be confined solely to the 
that such items of street furniture may pose similar risks across the 
railway network. 

To Network Rail and the London Borough of Camden: 

(4) In addition to the 

 mentioned at (3) above, the 

evidence revealed numerous items of street furniture on the 

,

 all of which could be used 

to facilitate easier access to the wall and the railway network. The 
concern here is that the siting of items of street furniture generally on 
this bridge poses risks to all manner of members of the public, from 
those contemplating suicide, to young children, and may undermine 
safety efforts to impede easy access to the railway network. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 6   ACTION SHOULD BE TAKEN 

In my opinion action should be taken to prevent future deaths and I believe 
you have the power to take such action. 

7 

YOUR RESPONSE 

You are under a duty to respond to this report within 56 days of the date of 
this report, namely 29 April 2024. I, the coroner, may extend the period. 

Your response must contain details of action taken or proposed to be taken, 
setting out the timetable for action. Otherwise, you must explain why no 
action is proposed. 

8 

COPIES and RESPONSE 

I have sent a copy of my report to the Chief Coroner and to the following 
Interested Person: 

• 

 (Vanessa Ford’s husband) 

I am also under a duty to send the Chief Coroner a copy of your response. 

The Chief Coroner may publish either or both in a complete or redacted or 
summary form. He may send a copy of this report to any person who he 
believes may find it useful or of interest. You may make representations to 
me, the coroner, at the time of your response, about the release or the 
publication of your response by the Chief Coroner. 

9 

Ian Potter 
HM Assistant Coroner, Inner North London 
4 March 2024

Responses

2 responses published against this report on judiciary.uk. A response is a body's written reply to the coroner's concerns; publication is at the discretion of the Chief Coroner's office, so an absent response does not mean nobody replied.

Response from Hackney Council (PDF)
In the matter of a response to a Prevention of Future Deaths Report arising from the
inquest into the death of Vanessa Ford

1. This is the response of the London Borough of Hackney to the Prevention of Future
Deaths Report (“PFD”) issued by HM Assistant Coroner for Inner North London, Ian
Potter, dated 4 March 2024 following an inquest into the death of Vanessa Ford
heard on 26 February 2024.

2. The London Borough of Hackney would like to offer their sincere condolences to the

family and friends of Vanessa Ford who tragically died on 23 September 2023.

3. The concerns expressed by the Coroner for this Council to consider, alongside

Network Rail, were as follows:

In addition to the small electrical box [on the pavement of the road
bridge], the evidence revealed numerous items of street furniture on the
Dalston Lane Road Bridge, such as recycling bins, all of which could be
used to facilitate easier access to the wall and the railway network. The
concern here is that the siting of items of street furniture generally on
this bridge poses risks to all manner of members of the public, from
those contemplating suicide, to young children, and may undermine
safety efforts to impede easy access to the railway network.

4. Upon receipt of the PFD, Officers from the Council conducted both desk based
investigations and site visits to accurately map what street furniture was present
either on the road bridge or in sufficient proximity to it which might facilitate access
to the railway network.

5. The Council identified the following pieces of street furniture in that location:
a. Small electrical box owned by Global Communications; and
b. Various recycling bins nearby on Martel Place, as described in the PFD

report.

6.

In respect of the electrical box, the Council has identified that the electrical box is
associated with an advertisement screen located on the flank wall of 85 Dalston
Lane. The site has a long history of being used for advertisements and most recently
benefits from advertisement consent granted by the Council, in its capacity as local
planning authority, under application reference 2024/0845.

7. Existing planning policy does not explicitly cover the 'location of street furniture in
proximity to road bridges over railway lines'. The National Planning Policy Framework
(NPPF”) refers to ‘street clutter’ at paragraph 116(c) where it refers to applications for
development creating “places that are safe, secure and attractive – which minimise
the scope for conflicts between pedestrians, cyclists and vehicles, avoid unnecessary

 street clutter, and respond to local character and design standards” but is otherwise
silent on the topic of the location of street furniture.

8. Apparatus such as electrical boxes like this which are often associated with
advertisement screens which are themselves subject
to the Town and Country
Planning (Control of Advertisements) (England) Regulations 2007. The NPPF states
that “advertisements should be subject to control only in the interests of amenity and
public safety, taking account of cumulative impacts”. The Council’s own planning
policy - LP33, LP7 - Advertisements - provides that advertisements must not cause a
physical obstruction to the public realm with the supporting text stating that should
not “add clutter to an already busy street scene thus adversely affecting the local
environment blocking the public realm and in some cases affecting highway safety”.

9. Discussions have taken place, and will continue, between the highways team and the
local planning authority to see whether an effective mechanism could be put in place
through the planning process to identify and flag up electrical apparatus and street
furniture at locations such as this one.

10. In respect of the various recycling bins nearby on Martel Place, the Council has taken

steps to remove those bins and this action was completed on 8 May 2024.

11. The Council has also been in contact with Network Rail to coordinate actions and
ensure clear ownership of responsibilities. The Council has received confirmation
from Network Rail that further measures to address specific concerns around the
access gate at Martel Place and the wall more generally are underway.

London Borough of Hackney
21 November 2024
Response from Network Rail (PDF)
OFFICIAL 

Ian Potter 
HM Assistant Coroner for Inner North London 
HM Coroners Office 

29 April 2024 

Re: Regulation 28 Report – Vanessa Ford 

Dear Sir, 

I refer to your report dated 4 March 2024 made under paragraph 7, schedule 5, of the Coroners 
and Justice Act 2009 and regulations 28 and 29 of the Coroners (Investigations) Regulations 2013. 

I would like to take this opportunity to express my sincere condolences to the family of Ms Ford. 
Please be assured that we take all incidents of this nature on the railway incredibly seriously and 
have carefully considered the matters raised in your report. 

Your  report  identifies  a  number  of  matters  of  concern  on  which  you  request  Network  Rail’s 
response. I have taken each of these matters in turn. 

(1)  Access to the railway tracks in the vicinity of Hackney Central/Dalston Kingsland 

In your report you refer to three (non-fatal) incidents in the vicinity of the Hackney Central/Dalston 
Kingsland areas of the rail network in the 12 months prior to this incident on 23 September 2023. 
You also refer to the British Transport Police Post Incident Site Report (DOCU Reference: DOCU 
2023  1576)  which  refers  to  these  incidents.  Though  Network  Rail  works  closely  with  the  BTP 
following  fatal  accidents  on  the  railway  and  participates  in  a  post-incident  site  visit  the  PISR  is 
authored by the BTP. 

I can confirm that the three incidents referred to each occurred at the Hackney Central and Dalston 
Kingsland railway stations. These are publicly accessible locations and in each instance access 
was taken from the public station areas directly onto the track. Management of the stations and 
relevant access mitigations is the responsibility of London Overground as Station Facility Owner. 
The  three  incidents  referred  to  therefore  do  not  suggest  that  access  to  the  railway  tracks  by 
members  of  the  public  may  be  a  frequent  issue  in  this  vicinity.We  have  no  other  records  of 
unauthorised access at this location. 

(2)  Mitigation measures 

The  specification,  inspection  and  maintenance  of  railway  boundary  measures,  including  the 
particular piece of wall which was used to access the railway network on 23 September 2023, is 
specified in Network Rail standard NR_L2_OTK_5100 Boundary Measure Management Manual. 
All boundaries to the rail network are assessed in accordance with Network Rail standards. This 
includes  assessing  the  likelihood  of  trespass  and  the  adequacy  of  boundary  measures,  which 
includes  consideration  of  the  risks  associated  with  the  adjoining  land  use  including  ancillary 
features  of a  location (such  as the presence of street furniture)  which may  exacerbate a risk or 
require further mitigation. 

I can confirm that all relevant inspection records were up to date and the boundary at this location 
was confirmed to meet Network Rail standards on its last inspection on 17 January 2023. 

Network Rail Infrastructure Limited Registered Office: Network Rail, One Eversholt Street, London, NW1 2DN Registered in England and Wales No. 2904587 www.networkrail.co.uk 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 OFFICIAL 

I  note  the  evidence  referred  to  in  your  report  regarding  the  nature  of  the  wall  at  this  location, 
specifically the wall along Martel Place referred to in the Post Incident Site Report. The wall has 
reviewed again following receipt of your report as part of Network Rail’s continuous boundary asset 
management approach. 

Although the boundary is assessed as compliant to Network Rail standards, we are working with 
the  Local  Authority  to  explore  if  further  measures  can  be  implemented  to  address  the  specific 
concerns  identified  by  this  incident.  Works  have  already  been  scheduled  to  be  undertaken  on 
during early May to the access gate at Martel Place so that it matches the height of the adjacent 
palisade fencing and the gap underneath the fence and the climbing foothold will be removed. We 
are  working  with  the  Local  Authority  to  consider  options  to  add  additional  measures  to  the  wall 
which may include the installation of Vanguard anti-climb rollers, planting Hawthorne or similar and 
installation of signage to warn people of the risks of the drop to the railway at the other side of the 
wall. It is anticipated that the selected option will be installed by early May 2024. 

(3)  Street furniture 

Street furniture such as the recycling bins or electrical boxes referred to in your report are managed 
by the Local Authority. In relation to specific issues on Dalston Lane Road Bridge and Martel Place, 
Network Rail is liaising with the Local Authority and understand that its Streetscene department is 
looking to re-locate some of the recycling bins. Though this is outside of Network Rail control we 
continue  to  support  the  exploration  of  any  improvements  that  can  be  made  at  this  location, 
alongside  the  physical  mitigations  being  explored  as  detailed  above.  We  consider  that  the 
mitigation works referred to above to add additional measures to the boundary will also address 
the concerns raised in your report regarding the electrical box. 

I hope that this response answers your concerns but if I can be of any further assistance, or if you 
would like further clarification, please do not hesitate to contact me. 

Yours sincerely, 

Route Director, Anglia Route 

Network Rail Infrastructure Limited Registered Office: Network Rail, One Eversholt Street, London, NW1 2DN Registered in England and Wales No. 2904587 www.networkrail.co.uk

Related reports

Other reports by Ian Potter

See all →

More reports categorised “Railway related deaths”

See all →

Track Railway related deaths

See every Prevention of Future Deaths report matching Railway related deaths, and how often a new one appears.

What would an alert for this have sent me? Search the full text

Free to try — the preview shows the real matches and how many arrived in the last 12 months. Your first email alert is free.

These reports are published by the Chief Coroner's office at judiciary.uk and are © Crown copyright. The text here is reproduced from the published PDF so it can be searched. If something on this page is wrong, or you are a person named in it and want it reviewed, email drcjar@gmail.com and we will act promptly.