Prevention of Future Deaths reports · 2023

Jamie Wood

Regulation 28 report to prevent future deaths, reference 2023-0061, written 17 Feb 2023. A coroner writes one of these when an inquest reveals a risk that could cause further deaths unless something changes.

Date of report17 Feb 2023
Reference2023-0061
DeceasedJamie Wood
CoronerBrendan Allen
Coroner areaDorset
CategoryOther related deaths
Sourcejudiciary.uk record · original PDF
Responses published1

The report

Text extracted from the PDF text layer. Reproduced verbatim, including the scan's own layout.

REGULATION 28:  REPORT TO PREVENT FUTURE DEATHS (1) 

REGULATION 28 REPORT TO PREVENT FUTURE DEATHS 
THIS REPORT IS BEING SENT TO: 

1.

 Chief Executive, The Health and Safety Executive

1  CORONER 

I am Brendan Joseph Allen, Area Coroner, for the Coroner Area of Dorset 

2  CORONER’S LEGAL POWERS 

I make this report under paragraph 7, Schedule 5, of the Coroners and Justice 
Act  2009  and  regulations  28  and  29  of  the  Coroners  (Investigations) 
Regulations 2013. 

3 

INVESTIGATION and INQUEST 
On the 5th February 2021, an investigation was commenced into the death of 
Jamie Paul Woods, born on the 12th August 1980. 

The  investigation  concluded  at  the  end  of  the  Inquest  on  the  7th  December 
2022. 

The Medical Cause of Death was: 

1a Multiple Injuries 

The  conclusion  of  the  Inquest  recorded  that  Jamie  Paul  Woods  died  as  a 
consequence of an accident. 

4  CIRCUMSTANCES OF THE DEATH 

Jamie Paul Woods was a farm worker at Hawkins Farm in Dorset. Hawkins Farm 
is a family-owned dairy farm. As part of the fabric of some of the buildings on 
the  farm,  pre-cast  concrete  panels  were  used  extensively,  predominately  as 
external walls for barns or similar. Typically, the concrete panels, which weigh 
approximately 800kg, are placed between vertical reinforced steel joists (RSJs), 
secured to the RSJ by means of a metal bracket bolted to the concrete panel. 
On  Hawkins  Farm  two  concrete  panels  had  been  repurposed  from  another 
building to form a divide between a “collecting yard” (an area where cattle are 
held prior to be being encouraged into the milking parlour) and an adjacent 
barn where straw was stored, with one panel placed on top of the other, to 
form a wall that was approximately 6 feet in height. The concrete panels did 
not  stretch between  the  two  RSJs  present.  As  a  consequence,  one  side was 
secured using the above-described method, with the other side being secured 
using  sections  of  steel  “box”  (hollow  steel  tubing)  welded  to  the  RSJ  and 
“clipped” against the rear of the concrete panel using a metal bracket. On 30th 
January 2021, Mr Woods was in the collecting yard when the upper concrete 
panel that divided the collecting yard from the straw storage came away from 
its  fixing,  causing  multiple  injuries  to  Mr  Woods,  who  was  sadly  confirmed 
deceased at the scene.  

1 

 5  CORONER’S CONCERNS 

The MATTERS OF CONCERN are as follows:   

1.  During the inquest evidence was heard that: 

i. 

The  sections  of  box  tubing  used  to  secure  one  end  of  the 
concrete  panels  to  the  vertical  RSJ  was  a  weaker  method  of 
securing  the  concrete  panels  in  place,  as  compared  to  the 
method  typically  used  (securing  the  panel  directly  to  the  RSJ 
using metal brackets bolted to the rear of the panel). They had 
been in place for a number of years and would have appeared 
to  have  been  present  when  Hawkins  Farm  was  subject  to 
inspections  by  outside  agencies,  yet  no  remedial  action  was 
required.  

2.  I have concerns with regard to the following: 

i. 

ii. 

Pre-cast concrete panels are likely extensively used across farms 
throughout  England  and  Wales.  The  equipment  required  to 
move panels between buildings is likely to be available on the 
majority of farms, meaning  that there is a significant  risk that 
farm owners/workers will move panels if necessary without the 
trades/professionals.  As  a 
need 
consequence,  there is a risk of the panels subsequently being 
fastened to vertical RSJs in a less secure manner, as occurred 
on Hawkins Farm. A collapsing concrete panel poses a clear risk 
of death, given their weight. 

to  external 

refer 

to 

There appears to be a lack of understanding of the importance 
of securing the panels in the optimal manner. It does not appear 
to have been understood by those working on the farm that the 
fixings that were used on the panel that collapsed were weaker, 
neither does it appear to have been appreciated by those that 
undertook inspections of the farm subsequent to the use of this 
weaker method of fixing. Publicising the risks and educating the 
farmers of the risks of departing from the recognised method of 
fixing the pre-cast concrete panels may reduce the risk of future 
deaths. 

6  ACTION SHOULD BE TAKEN 

In my  opinion urgent  action should be taken to prevent  future deaths and I 
believe you and/or your organisation have the power to take such action.    

7  YOUR RESPONSE 

You are under a duty to respond to this report within 56 days of the date of 
this report, Friday 14th April 2023. I, the coroner, may extend the period. 

Your response must contain details of action taken or proposed to be taken, 
setting out the timetable for action. Otherwise, you must explain why no action 
is proposed. 

2 

 
 
 
 
 
 
 
 
 
 
 
 8  COPIES and PUBLICATION 

I  have  sent  a  copy  of  my  report  to  the  Chief  Coroner  and  to  the  following 
Interested Persons: 

(1) Trethowans Solicitors (solicitors for Mr Woods’ family); 
(2) DAC Beachcroft (solicitors for Hawkins Farm Partnership). 

I am also under a duty to send the Chief Coroner a copy of your response.  

The  Chief  Coroner  may  publish  either  or  both  in  a  complete  or  redacted  or 
summary  form.  He  may  send  a  copy  of  this  report  to  any  person  who  he 
believes may find it useful or of interest. You may make representations to me, 
the coroner, at the time of your response, about the release or the publication 
of your response by the Chief Coroner. 

9  Dated 

17th February 2023 

Signed 

Brendan J Allen  

3

Responses

1 response published against this report on judiciary.uk. A response is a body's written reply to the coroner's concerns; publication is at the discretion of the Chief Coroner's office, so an absent response does not mean nobody replied.

Response from Health and Safety Executive (PDF)
Health and Safety 
Executive 

Unit 9 Head of Operations 
Field Services Division (FOD) 
2 Rivergate 
Temple Quay 
Bristol 
BS1 6EW 

FOD Deputy Director 

The Coroner's Office for the County of Dorset 
Civic Centre, 
Bourne Avenue, 
Bournemouth 
BH2 6DY 

Date: 31st  March 2023 

Dear Sir, 

Thank you for your letter dated 17th February to Sarah Albon Chief Executive of the Health and 
Safety Executive (HSE) and your Regulation 28 report to prevent further deaths  following  the 
inquest touching on the death of Jamie Paul Woods. 

I  have  been  asked to  respond  as  I  lead  the  operational teams which  undertake  interventions 
and investigations on farms in South-West England. 

As  you  have  identified  the  panels  in  this  instance  were  not  installed  in  accordance  with  the 
recommended fixings and an alternate arrangement was used to attach the panels a one end. 
The panels had provided a walling solution (to segregate the collecting yard from the storage 
area of the barn) for a considerable period and it appears that any deterioration in the structural 
integrity of  any  fixings  and/or any  instability  in  the  wall  was not  obvious or  recognised  by the 
farm partnership or any other party. 

The circumstances associated with this instance appear to be an isolated bespoke fabricated 
solution which in the experience of the HSE is not replicated widely within agricultural buildings. 
Traditionally concrete panels are a fixed solution and not moved or routinely repurposed. The 
HSE enquires looked at the wider use of the pre-cast panels on the farm which were found to 
be installed in accordance with the manufacturer’s instructions. 

Where installed correctly concrete panels have been shown to have a considerable longevity. 
There is no history indicating any concern as to the integrity and structural stability of concrete 
pre-cast  components  used  as  a  walling  solution  where  they  have  been  installed  with  the 
manufacturer’s prescribed fixings and attached firmly to steel uprights. The panels however can 

 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
  
 
 
  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
  
 
  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 only  be  loaded  on  one  side  as  their  integrity  and  strength  is  provided  by  load  on  the  panels 
being transferred to the steel structure rather than relying on the tensile strength of the fixings. 

The HSE recognises the risks associated with buildings and promote this through guidance and 
working  with  wider  industry  stakeholders.  The  current  guidance  on  the  HSE  web  pages  and 
through  “gov.uk”  extends  to  building  work  and  maintenance  that  farmers  may  undertake 
themselves  and  includes  managing  contractors  who  undertake  building  work  (including 
contractor selection/planning the work). Although pre-cast panels are not specifically referenced 
it  includes  the  need  to  keep  buildings  in  good  repair  and  offers  guidance  on  assessing  and 
managing the risks on farms and sourcing competent advice. 

The HSE engages with a wide range of industry stakeholder and intermediaries to promulgate 
key messages and increase the awareness of the risks to health and safety in Agriculture. One 
part of this work is the distribution of timely messages following incidents. In February 2021 the 
HSE’s national agriculture team promoted information relating to building integrity through the 
Farm Safety Partnership (FSP*) chairs and Agriculture Industry Advisory Committee (AIAC**) 
members.  This  included  the  need  to  keep  farm  buildings  in  a  safe  condition  and  properly 
maintained  and  the  importance  of  periodic  structural  checks  The  FSPs  have  a  rolling 
programme  of  activities  and  building  maintenance  and  work  at  height  is  regularly  promoted. 
HSE will continue to look for opportunities to help farmers manage and control the risks on their 
premises, including those arising from building integrity. 

HSE uses a blend of health and safety interventions in agriculture to tackle the high injury rates. 
For example, the published HSE workplan includes the targeted inspection of farms including 
those with beef and dairy cattle in conjunction with HSE funded training to help farms prepare 
for the inspection. This covers key topics including risk assessment, building maintenance, work 
at height and the risks from falling objects. 

HSE’s  work  in  the  agriculture  sector  is  regularly  reviewed  to  reflect  emerging  issues  and 
concerns  in  response  to  learning  and  recommendations  following  incidents.  We  update 
guidance where necessary and use briefings update industry and HSE inspectors.  Further to 
your report we are exploring how we can promote the key aspects with the FSPs and AIAC. 

I hope that this response provides you with the necessary assurance that the HSE recognises 
the risks  associated  with  farming  activities,  strives  to prevent  further  ill health  and  injury,  and 
will take proportionate action following your recommendation. 

Yours faithfully 

FOD Unit 9- Head of Operations HSE Bristol 

Page 2 of 3 

 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 *FSP:  The  aim  of  each  Farm  Safety  Partnership  (one  in  each  home  nation)  is  to  increase 
awareness of farm safety and to reduce work related fatalities and injuries on farms. The FSPs 
are  made  up  of  key  stakeholders  with  an  interest  in  farm  safety  and  they  use  their 
communications and memberships to get timely information and farmer focussed messages to 
those working in agriculture. 

**AIAC: HSE’s Agriculture Industry Advisory Committee works to better understand and identify 
the risks to the health and safety of farmers and farm workers. The AIAC membership includes 
the  HSE,  National  Farmers  Union,  National Association  of  Agricultural  Contractors,  Unite the 
Union,  the  Institution  of  Occupational  Safety  &  Health,  LANTRA  (leading  awarding  body  for 
land-based  industry  training  in  GB),  National  Federation  of  Young  Farmers  Clubs,  and  Land 
based colleges aspiring to excellence (Landex) 

Page 3 of 3

Related reports

Other reports by Brendan Allen

See all →

More reports categorised “Other related deaths”

See all →

Track Brendan Allen

See every Prevention of Future Deaths report matching Brendan Allen, and how often a new one appears.

What would an alert for this have sent me? Search the full text

Free to try — the preview shows the real matches and how many arrived in the last 12 months. Your first email alert is free.

These reports are published by the Chief Coroner's office at judiciary.uk and are © Crown copyright. The text here is reproduced from the published PDF so it can be searched. If something on this page is wrong, or you are a person named in it and want it reviewed, email drcjar@gmail.com and we will act promptly.