Regulation 28 report to prevent future deaths, reference 2025-0646, written 18 Dec 2025. A coroner writes one of these when an inquest reveals a risk that could cause further deaths unless something changes.

Date of report18 Dec 2025
Reference2025-0646
DeceasedJohn Oates
CoronerKirsty Gomersal
Coroner areaCumbria
CategoryOther related deaths
Sourcejudiciary.uk record · original PDF
Responses published1

The report

Text extracted from the PDF text layer. Reproduced verbatim, including the scan's own layout.

MISS K J GOMERSAL 
HM SENIOR CORONER 

County of Cumbria  

Fairfield 
Station Rd 
Cockermouth, CA13 9PT 

REGULATION 28 REPORT TO PREVENT FUTURE DEATHS 

JOHN HENRY OATES known as HARRY OATES 

THIS REPORT IS BEING SENT TO: 

Electricity Networks Association 

1 

CORONER 

I am Miss Kirsty Gomersal HM Senior Coroner for County of Cumbria 

2 

CORONER’S LEGAL POWERS 

I make this report under paragraph 7, Schedule 5, of the Coroners and Justice Act 2009 
and regulations 28 and 29 of the Coroners (Investigations) Regulations 2013: 

https://www.legislation.gov.uk/ukpga/2009/25/contents 

http://www.legislation.gov.uk/uksi/2013/1629/contents 

3 

INVESTIGATION and INQUEST 

Throughout the course of my investigation into Mr Oates’ death, his family invited me to 
call him Harry. I shall do so throughout this Report.  

Harry died on 27 October 2023 in a field at Badger Gate, Lupton, near Carnforth in 
Cumbria. 

Following post-mortem examination, the medical cause of Harry’s death was found to be: 

1(a) Electrocution 

An investigation into Harry’s death was commenced on 31 October 2023.  

An Inquest into Harry’s death was opened on 14 November 2023 by HM Assistant Coroner 
Robert Cohen. At the same time, Harry’s Inquest was suspended in opening in accordance 
with Coroners and Justice Act 2009 Schedule 1 Part 1 Paragraph 5 pending the outcome of 
external agency enquiries. 

The investigation into Harry’s death resumed on 19 July 2024 and his inquest was held 
before me on 9, 10 and 11 December 2025. I delivered my findings, determination and 
conclusion on 16 December 2025.  

The determination was: 

On 27 October 2023, Mr John Henry Oates, who was known as Harry, was on a training 
run. At approximately 14:07 Harry was running on a public footpath on a field at Badger 

1 

 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 Gate when he came into contact with a low hanging 11 kv electricity conductor. Harry was 
killed immediately. His death was confirmed at 1835.  

The conductor had been released from its usual position on 25 October 2023 at about 
16.17 and became suspended on equipment lower down the pole. The conductor did not 
go to earth and remained live. At the time, there was no automatic means of detection of 
the low hanging line. The low hanging line had not been reported.  

The low hanging line was caused by the simultaneous failure of two porcelain tension disc 
insulators on 25 October. The root cause of the insulator failures was voids in the cement 
fill. Voids in the cement were not known at the time. These voids allowed internal electrical 
discharge. This caused the electrical failure of the first insulator. This failure led to the top 
cross arm becoming energised. This caused the second insulator to fail electrically and 
mechanically. The live conductor was released and suspended from the lower cross arm on 
the supporting pole. This sequence of events was rare and complex. It lead to the 
conductor become low hanging yet remaining energised. 

The conclusion of the inquest was: 

Harry died due to a rare and complex sequence of events 

4 

CIRCUMSTANCES OF THE DEATH 

On 27 October 2023, at about 11:50, Harry departed his parents’ home for a training run.  
Whilst crossing a field at Badger Gate, at approximately 14:07, Harry came into contact 
with a low hanging 11kv electrical conductor wire which had fallen from its usual height at 
over 8 metres at pole 660901.  Harry was located at 16:S34 by his father and brother who 
raised the alarm. Emergency services and ENWL attended the scene. Harry had sustained 
injuries inconsistent with life. His death was instantaneous. Harry’s death was formally 
confirmed at 18:35. 

ENWL is the Distribution Network Operator (“DNO”) responsible to the electrical 
conductor.  

ENWL and HSE carried out an investigation into the incident. It was found that: 

On 25 October 2023 at approximately 16:17, there was a simultaneous failure of two 
porcelain tension disc insulators on pole 660901 in the field at Badger Gate. 

This caused the 11kv conductor wire to become released from its usual position. The 
length of the conductor wire was extended by the “dropper”. The conductor became 
suspended on a cross arm further down the pole hosting an Auto Sectioning Link. 

This resulted in a “low hanging line”. As the line did not go to earth, it remained 
energised.  

The fault on pole 660901 was detected as a “phase to phase” transient fault and 
automatically reconnected in accordance with ENWL procedure. At the time, a phase-to-
phase fault was not known to lead to a low hanging line.  

Evidence was consistent that, at the time, there was no automated mechanism to detect 
a low hanging line and that electricity industry relied on low hanging lines being reported 
by members of the public. The low hanging line was not reported to ENWL until after the 
incident.  

As part of ENWL’s investigation into the incident, approximately 260 insulators were 
examined and tested. 73% of insulators were found to contain voids in the cement fill of 
the porcelain insulators. These voids were introduced during the manufacturing process. 
The presence of voids was not known until identified through ENWL’s investigation 

2 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 despite the insulators having been used throughout the electricity (and other) industries 
since the 1950s.  

The voids in the cement fill led to microcracking and subjected the cement to 
environmental factors. The voids and microcracking affected the cement integrity and 
created “air gaps” which permitted internal electrical discharge.  

Further, the investigation also found that a number of insulators had asymmetrical pins.  I 
found that the insulators in question were likely to have asymmetrical pins as well as 
voids but it was not possible to determine the contribution of the asymmetrical pins to 
the insulator failure.  

The root cause of the insulators’ failure was voids within the cement fill.   

The first insulator failed electrically due to an internal flashover / short circuit. This caused 
the steel cross arm of the pole (to which the insulators were fixed) became energised. The 
second insulator consequently failed electrically and mechanically. 

The evidence was that whilst insulator failures were recognised, a double insulator failure 
had not been known to previously occur.  

The poles and insulators were inspected in accordance with procedures consistent with 
industry standards. There were no relevant concerns following the last inspection in 
August 2023. There were no visual signs that the insulators had a fault. There was no 
means of testing the insulators in situ at the time.  

The electricity conductor was above the minimum height required and that the pole span 
was within the maximum span permitted by the relevant British Standard.  Placement of 
the supporting poles depends on a number of factors. The evidence of the HSE inspector 
was that the placement of the poles did not cause him concern.  

The failure mode was described in several ways by the witnesses including “first to our 
knowledge and not experienced before”, complex, unique, very unique, not known, 
unprecedented, rare and extremely rare.  

I determined that the failure mode, described above, was a rare and complex sequence of 
events which directly caused Harry’s death.  

I heard evidence of the steps that ENWL had and were taking as a result of its 
investigations: 

1.  The use of porcelain insulators was stopped.  

2.  ENWL estimated that, within its network, there are approximately 8,000 

locations where porcelain insulators are present above equipment affixed lower 
down the pole on which a conductor may become suspended. Where 
maintenance work is required at those locations, ENWL will replace the porcelain 
insulator. ENWL intends to embark on a replacement program but this requires 
liaison with OFGEM due to the extent of the work and outages required.  

3. 

It is now recognised that a phase-to-phase fault can lead to a low hanging line; 
this was not the case prior to the incident. Although patrols were not required 
prior to Harry’s death, ENWL now carries out patrols of lines affected by a phase-
to-phase fault within 48 hours.  

4.  ENWL will also consider the placement of support poles relative to a right of way 
in future. I did not find that the placement of the support poles was contributor 
to Harry’s death.  

3 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 5.  ENWL has installed a system called Linesight across 77% if its network. It intends 
to install Linesight across 80% of its network (some parts of the network are not 
suitable for Linesight installation). Linesight is new technology which relies on 
detection and AI. Linesight is able to detect low hanging lines. Further, Linesight 
can also detect if insulators are becoming electrically charged due to an internal 
issue.  

I heard that ENWL had shared the results of its findings with OFGEM, HSE, ENA and other 
DNOs.  

However, whilst witnesses could outline what they believed was being done by other 
DNOs, they could not provide a full overview of action being undertaken by others.  

The ENA was not an Interested Person in Harry’s inquest. It did attend nor did it provide 
any evidence to me – and was not asked to do so.  

5 

CORONER’S CONCERNS 

The evidence revealed matters giving rise to concern. In my opinion there is a risk that 
future deaths will occur unless action is taken. In the circumstances it is my statutory duty 
to report to you. 

The MATTERS OF CONCERN are as follows: 

1.  The cement fill within the porcelain tension disc insulators was found to contain 
voids in 73% of the insulators tested. These voids were introduced during the 
manufacturing process. The industry was unaware of these voids until discovered 
during ENWL’s investigation.  Porcelain tension disc insulators are used widely 
throughout the electricity industry – and other industries.  

2.  Some of the discs tested were also found to have asymmetrical pins which increased 

the internal stresses on the insulators.  

3.  Either voids alone or in combination with an asymmetrical pin create a means by 

which electric current can pass across the voids and lead to failure of an insulator.  

4.  There has now been a double insulator failure.  

5.  A phase-to-phase fault can lead to a low hanging line. This was not known prior to 

Harry’s death.  

6.  There will be locations across the UK which have the combination of porcelain 
tension disc insulators situated above equipment (such as an ASL) on which a 
conductor could be suspended in the event of disc failure.  

7.  Although at the time of the incident, there was no automatic means of detecting a 

low hanging line, technology now exists that can detect both these factors and which 
narrows the area in which the low hanging line is situated – Linesight.  

8.  It has also been determined that Linesight can detect that an insulator may be 

subject to internal stresses. 

Although the failure mode was “rare and complex”, there is a risk of future deaths albeit a 
low one. This presents an opportunity for guidance to be given on re-assessment of risk 
and risk reducing measures. Although I determined that the placement of the support 
poles was not materially contributive to Harry’s death, there is also an opportunity for this 
to be considered.  

4 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 6 

ACTION SHOULD BE TAKEN 

In my opinion action should be taken to prevent future deaths and I believe the  

Electricity Networks Association 

has the power to take such action.  

The ENA is the electricity networks industry representative and supports its members to 
deliver energy safely and share best practices. It has a Safety Health and Environment 
Committee and issues best practice to the industry.  

I again stress that the ENA was not an Interested Person in Harry’s inquest. It did attend 
nor did it provide any evidence to me – and was not asked to do so. 

7 

YOUR RESPONSE 

You are under a duty to respond to this report within 56 days of the date of this report, 
namely by 13 February 2026. 

I, the Coroner, may extend the period. 

Your response must contain details of action taken or proposed to be taken, setting out 
the timetable for action. Otherwise, you must explain why no action is proposed. 

8 

COPIES and PUBLICATION 

I have sent a copy of my report to the Chief Coroner and to the following Interested 
Persons: 

Harry’s family  
ENWL (now SP Electricity North West)  
HSE  

I have also sent a copy to:  

OFGEM 

And the following DNOs: 

Scottish & Southern Electricity Networks 
SP Energy Networks 
Northern Powergrid 
UK Power Networks 
National Grid 
ESB Networks 
Manx Utilities 
Northern Ireland Electricity Networks 

Whilst I appreciate that ESB Networks, Manx Utilities and Northern Ireland Electricity 
Networks do not fall within the Coroner’s jurisdiction, in my view, it is appropriate to 
bring this Report to their direct attention.  

I am also under a duty to send the Chief Coroner a copy of your response.  

The Chief Coroner may publish either or both in a complete or redacted or summary 
form. She may send a copy of this report to any person who he believes may find it useful 
or of interest. You may make representations to me, the Coroner, at the time of your 
response, about the release or the publication of your response by the Chief Coroner. 

5 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 9 

Dated this 18 day of December 2025 

Miss Kirsty J Gomersal LLB 
HM Senior Coroner  
County of Cumbria 

6

Responses

1 response published against this report on judiciary.uk. A response is a body's written reply to the coroner's concerns; publication is at the discretion of the Chief Coroner's office, so an absent response does not mean nobody replied.

Response from Electricity Networks Association (PDF)
Miss K J Gomersal LLB | Senior Coroner | Cumbria 
Fairfield, 
Station Road, 
Cockermouth, 
Cumbria, 
CA13 9PT 

Wednesday, 11 February 2026 

Dear Miss Gomersal, 

This letter is the response from Energy Networks Association (‘ENA’) to your Regulation 
28: Report to prevent future deaths, dated 19th December 2025 into the death of Henry 
John Oates.  

We  are  deeply  saddened  by  the  tragic  death  of  Mr  Oates  and  want  to  express  our 
deepest sympathies and extend our condolences to his family and friends. 

ENA represents the companies which operate the electricity networks in  the UK and 
Ireland.  We  support  our  members  to  meet  the  challenge  of  delivering  electricity  to 
communities across the UK and Ireland safely, sustainably, and reliably and share best 
practice.  Our  members’  duties  are  enshrined  in  many  legislative  provisions  and  in 
regulatory licence conditions issued by Ofgem, the industry regulator. 

As you have stated, ENA was not an Interested Person (and did not participate in any 
way) in the inquest which you held in this case, nonetheless we recognise the concerns 
you have identified and aim to facilitate a pathway for our member companies to further 
consider and implement proactive measures. 

I would like to take the opportunity to confirm that the essential elements related to the 
death  of  Mr  Oates  have  already  been  shared  with  member  companies  through  our 
member forums.   

ENA  has  carefully  considered  the  concerns  set  out  in  your  Report  to  prevent  future 
deaths and wishes to outline the actions being taken by ENA to reduce the likelihood of 
similar events occurring in the future. Following the immediate actions undertaken by 
Scottish Power Electricity North West (SP ENW) and items as referenced in your report, 
ENA has convened member company representatives  to consider the learnings from 
this case and determine how existing arrangements can or should be improved. 

The actions we have taken and intend to take include the following: 

 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 Objective 1: Review and improve where necessary, Safety, Health and 
Environment (SHE) industry standards and public safety risk assessment  
ENA and its members will: :  

-  Review and update if deemed necessary, the relevant ENA SHE Standards 

(including Standard 06 - Post Trip Manual Reclosing of High Voltage Electrical 
Distribution Circuits & Standard 09 - Distribution Network Operator Response 
to Reports of Low or Grounded Overhead Lines) in consideration of the 
information shared from this incident.  

-  Develop supplementary guidance to address the risk relating to overhead 
lines that have automatically reclosed where a low hanging conductor may 
exist but has not been reported or been detected. The guidance will establish 
a risk assessment criteria for member companies to consider, informed by 
industry best known and available practices. This should inform and 
strengthen existing ways of working and support appropriate interventions 
such as risk-targeted inspections or patrols, asset location data, enhanced 
monitoring, and other appropriate or technical solutions to proportionately 
mitigate foreseeable risk.  

ENA will oversee delivery of these objectives and ensure they are completed no later 
than September 2026. 

This additional guidance will support ENA member companies in reviewing and 
updating their own individual associated public safety risk assessments, which each 
company has committed to undertake and continue to review periodically.  

Objective 2: Review  and improve engineering evidence, asset risk awareness 
and promote risk-based investment  
ENA and its members will also: 

-  Develop an Engineering Technical Report (ETR) to collate and document 
engineering evidence on asset failure modes relevant to this incident, 
consolidating findings from SP ENW and concerns identified in your report, 
and incorporate learning from wider industry experiences. It will also capture 
and review other relevant or emerging failure mechanisms, providing a 
reference resource for ENA member companies. 

The ETR will provide a clear evidence base to support ENA member companies in 
undertaking their own risk-based assessments and determining proportionate 
interventions or investment actions required, aligned to their specific asset populations 
and public safety risk profiles. 

The ENA will oversee delivery of these objectives and ensure they are completed  no 
later than September 2026. 

Broader objectives 
ENA will continue to promote improvements in engineering standards and raise 
awareness of available and emerging innovative monitoring and detection 
technologies, including those referenced in your report. ENA member companies will 
assess the effectiveness of these solutions and share current and emerging good 

 
 
 
 
 
 
 
 
 
 
 
 
 practice to support assessment of asset risk exposure, development of maintenance 
strategies, investment planning, price control submissions, and engagement with 
Ofgem. Where appropriate, such technologies will be promoted through ENA’s 
Smarter Networks Portal or similar mechanisms to support planned, risk-based 
investment in potential innovative monitoring and detection solutions. 

ENA will also continue to review and, where necessary, update existing ENA 
Engineering, SHE documentation and general advice to reflect newly identified or 
emerging failure mechanisms. 

Summary 
Together, the two objectives will deliver clear, practical industry guidance to support 
the continuous improvement of health and safety risk assessment and interventions 
associated with low hanging overhead line conductors, while also providing an 
evidence-based framework to support informed, risk-based asset management and 
investment decisions by individual member companies.  

I can confirm that once the above objectives as outlined are completed, ENA will 
produce a summary briefing for our members. The briefing will be shared with the 
Health and Safety Executive (HSE) to support the dialogue ENA and member 
companies have already started with them.  

I  trust  that  the  information  and  response  provided  above  will  help  to  discharge  our 
responsibilities in this matter.   

The industry regrets any loss of life related to our activities or infrastructure and takes 
our duties to minimise these risks very seriously.  

Yours sincerely, 

Chief Executive

Related reports

Other reports by Kirsty Gomersal

See all →

More reports categorised “Other related deaths”

See all →

Track Kirsty Gomersal

See every Prevention of Future Deaths report matching Kirsty Gomersal, and how often a new one appears.

What would an alert for this have sent me? Search the full text

Free to try — the preview shows the real matches and how many arrived in the last 12 months. Your first email alert is free.

These reports are published by the Chief Coroner's office at judiciary.uk and are © Crown copyright. The text here is reproduced from the published PDF so it can be searched. If something on this page is wrong, or you are a person named in it and want it reviewed, email drcjar@gmail.com and we will act promptly.