Prevention of Future Deaths reports · 2018
Regulation 28 report to prevent future deaths, reference 2018-0191, written 22 Jun 2018. A coroner writes one of these when an inquest reveals a risk that could cause further deaths unless something changes.
| Date of report | 22 Jun 2018 |
|---|---|
| Reference | 2018-0191 |
| Deceased | Samuel Clarke |
| Coroner | Mary Hassell |
| Coroner area | Inner North London |
| Category | Accident at Work and Health and Safety related deaths |
| Source | judiciary.uk record · original PDF |
| Responses published | 1 |
Text extracted from the PDF text layer. Reproduced verbatim, including the scan's own layout.
Regulation 28: Prevention of Future Deaths report
Samuel Patrick CLARKE (died 02.01.18)
THIS REPORT IS BEING SENT TO:
1. Sir George Iacobescu
Chairman and Chief Executive Officer
Canary Wharf Group plc
One Canada Square
Canary Wharf
London E14 5AB
1
CORONER
I am: Coroner ME Hassell
Senior Coroner
Inner North London
St Pancras Coroner’s Court
Camley Street
London N1C 4PP
2
CORONER’S LEGAL POWERS
I make this report under the Coroners and Justice Act 2009,
paragraph 7, Schedule 5, and
The Coroners (Investigations) Regulations 2013,
regulations 28 and 29.
3
INVESTIGATION and INQUEST
On 8 January 2018, one of my assistant coroners, Sarah Bourke,
commenced an investigation into the death of Samuel Patrick Clarke,
aged 19 years. The investigation concluded at the end of the inquest on
15 June 2018.
I made a determination that Samuel’s death was the result of an
accident, when he fell from height whilst on a construction site at 1 Bank
Street in London at approximately 2.30am on New Year’s Day 2018, and
was not found until the following day.
4
CIRCUMSTANCES OF THE DEATH
1
Samuel left a 2017 New Year’s Eve celebration and ended up gaining
access to the One Bank Street site in the early hours of New Year’s Day.
He made himself known to security guards but then ran off. CCTV was
checked and there was no sign of him leaving the site. A search ensued
but the police were not called.
He was not found until 2 January 2018, by which time he was dead. It
was not the impact of his fall that killed him and so if he had been found
earlier, he might have been saved. His medical cause of death was as
follows.
1a postural asphyxia
1b fall and traumatic injury
1c ethanol intoxication
5
CORONER’S CONCERNS
During the course of the inquest, the evidence revealed matters giving
rise to concern. In my opinion, there is a risk that future deaths will occur
unless action is taken. In the circumstances, it is my statutory duty to
report to you.
The MATTERS OF CONCERN are as follows.
1. I was told by the senior construction manager of Canary Wharf
Contractors Limited that the gap under the turnstile where Samuel
accessed the site has been reduced by 5cms since his death,
from 30cms to 25cms, by adding a strip of plywood to the bottom.
I am concerned that the turnstile is still accessible to unauthorised
personnel – including to children. I heard at inquest that there are
800 tradespeople on site and I wonder whether one of them has
the skills to make the turnstile secure?
2. I heard evidence that, since Samuel’s death, site security officers
have been given instructions to call the police if they are aware of
an intruder on site who has not been located. However, no
consideration has been given to a company contingency plan, for
example to draft in staff who are familiar with the site to help with
a search. Would this be possible?
3. The site security officers explained to me that they were equipped
with battery operated regular sized torches, rather than large
flashlights. No consideration has been given to improving their
equipment in this regard. Could it be?
2
6
ACTION SHOULD BE TAKEN
In my opinion, action should be taken to prevent future deaths and I
believe that you have the power to take such action.
7
YOUR RESPONSE
You are under a duty to respond to this report within 56 days of the date
of this report, namely by 20 August 2018. I, the coroner, may extend the
period.
Your response must contain details of action taken or proposed to be
taken, setting out the timetable for action. Otherwise you must explain
why no action is proposed.
8
COPIES and PUBLICATION
I have sent a copy of my report to the following.
HHJ Mark Lucraft QC, the Chief Coroner of England & Wales
senior construction manager,
Samuel’s parents
Canary Wharf Contractors Ltd.
I am also under a duty to send the Chief Coroner a copy of your
response.
The Chief Coroner may publish either or both in a complete or redacted
or summary form. He may send a copy of this report to any person who
he believes may find it useful or of interest. You may make
representations to me, the Senior Coroner, at the time of your response,
about the release or the publication of your response by the Chief
Coroner.
9
DATE SIGNED BY SENIOR CORONER
22.06.18
3
1 response published against this report on judiciary.uk. A response is a body's written reply to the coroner's concerns; publication is at the discretion of the Chief Coroner's office, so an absent response does not mean nobody replied.
Response to the Coroner’s Report Following the inquest relating into the death of Samuel Clarke, which occurred on the construction site at 1 Bank Street, Canary Wharf , three issues were raised by the Coroner and set out in the ‘Prevention of Future Deaths report’ received on 22™June 2018. The purpose of this document is to provide an overview of the security arrangements employed across Canary Wharf's construction projects to explain measures taken to prevent unauthorised entry and to respond specifically to the three concerns raised by the Coroner in the report Overview of Security Arrangements Canary Wharf Contractors (CWCL) place considerable importance on health, welfare, safety and the security of its sites. Requirements for all projects follow and in most cases exceed the standards set out in the relevant construction legislation and associated HSE guidance. In relation to security, our projects employ qualified and industry accredited security companies to manage its sites. The implementation of site security procedures is overseen by CWCL project managers. Procedures are tailored to the respective projects but in all cases significant security measures are employed in order to deter, identify and locate intruders with the aim of ensuring their safety and the protection of the site. Measures include the following: 1. The site perimeter is secured by a plywood hoarding, 2.4 metres in height in line with industry requirements. The hoardings are also fitted with a system of wires which when broken, offer a visual indication to patrolling security staff that the fence may have been scaled. 2. CCTV is in operation across the Canary Wharf Estate, around the perimeter of the site boundary and within certain areas of the project. The CCTV, pertinent to each site, is monitored by a dedicated security guard located within the project and relayed back to an external control room. The guard works in conjunction with another security guard also based on the site. 3. Projects have a security presence 24/7. Security guards carry out various functions including patrols of the site and welfare/office areas, monitoring of the CCTV, managing visitors, notifying senior management of any incident as appropriate and initial liaison with emergency services. 4. Within each site certain areas are secured to deter and restrict Intruders from entering. For example, stair cores leading to the top of the building; crane bases to prevent intruders climbing to the top of the tower cranes and barriers surrounding excavations and trenches. 5. Various patrol validation points are located within the site boundary. During the regular patrols the security guards are required to swipe these points to demonstrate that they have patrolled the associated areas. The patrols are monitored to ensure they are completed properly. As a project evolves additional patrol check points may be introduced, dependent on the size and complexity of the site layout. 6. Where there is a risk of fall from height, suitable scaffold handrailing or edge protection guarding is installed in accordance with requirements set out in Work at Height Regulations 2007 and relevant industry standards. 7. The projects have suitable and sufficient lighting to illuminate safe pedestrian access and egress and traffic routes. Additional task lighting is also used when works are in progress. Canary Wharf Group has recently obtained a high court injunction (Canary Wharf Investments v Brewer [2018] EWHC 1760 (QB) (23 February 2018)) covering the Canary Wharf Estate. Breach of the court order may constitute contempt of court and result in fine or imprisonment. Notices are displayed around various locations on the estate, warning that the injunction applies to any person trespassing in breach of the orders. This measure seeks to deter and protect individuals who may seek to gain unauthorised access to sites. Following Samuel’s death a review of the project was conducted by the HSE Inspector Sharon Boyd. The Inspector's review included the fall prevention measures, the site perimeter, access entry hardware, the general site layout and the security procedures. The Inspector was generally satisfied with the site arrangements and controls implemented. A meeting was convened by the Inspector with the project security provider which was attended by Canary Wharf Groups Head of Security. The meeting discussed the procedures to ensure clarity relating to the protocols in the event of trespassers. Following this review meeting, amendments were made to the security procedures to ensure clear protocols across all projects in the event of trespassers. As part of the procedural review, Canary Wharf Group has engaged with the Metropolitan police for specific guidance, in the event of persons being identified as entering a project. The Metropolitan Police have informed Canary Wharf Group that their deployment to construction sites will be dependent on the individual circumstances and the dynamic risk assessments of the officers attending or, if it is more serious, the local Duty Inspector. Response to the Coroner's Concerns Please find below a response to the matters of concern raised within the Coroner's Prevention of Future Deaths Report Concern 1 - Turnstile height. During the inquest it was stated that the gap under the turnstile where Samuel accessed the site had been reduced by 5cm (from 30cm to 25cm) following his death. This was an incorrect estimate as the gap had in fact been reduced by 10cm (from 30cm to 20cm) by the introduction of a robust plywood ramp spanning the entire base of the turnstiles so as to raise the ground level. The photo 1 below showing the reduction in gap was sent to the HSE (inspector as a sufficient control measure to prevent similar unauthorised access. The inspector confirmed receipt and required no further action. The turnstiles are located within an area where CCTV is in operation. During normal working hours the entrance is used by the entire workforce to enter and exit the project, monitored by the construction security office which is situated adjacent to the turnstiles. Following concerns raised at the inquest, a further review of the turnstile was undertaken. As a result, at the end of each day shift, temporary solid panels are installed to the inside face of the turnstile pods aimed at preventing any unauthorised out of hours access to the site via this route. See photo 2 below. This issue does not affect any other existing projects but on future projects where access to site is via a turnstile direct from public realm, similar security measures will be adopted. CWCL undertook a review of the access control entry points and the site perimeters across all of its projects to identify any potential areas where intruders could access the projects. This has resulted in the gaps at the base of delivery gates also being reduced. Photo 1— Reduction in gap Photo 2 - Photo taken from inside the site showing a turnstile without the demountable panel installed and a turnstile with the demountable panel in place. Concern 2 —- Company Contingency Plan Following Samuel's death, site instructions have been reviewed and amended to clarify the action to be taken in the event of trespass and to ensure personnel are not put at risk. The Company’s security procedures, in terms of communication and escalation to the Emergency Services, have been amended accordingly. A briefing has been held with all construction security guards to ensure the updated procedures are understood. These instructions outline clear roles and responsibilities for the communication and escalation processes for the Canary Wharf Estate security provided by Canary Wharf Management Ltd (CWML) as well as for the security companies engaged by Canary Wharf Contractors Ltd (CWCL) to provide site security. e The security procedures include instructions for a search and seek procedure for a trespasser by the site security provider. This may require the site team to escalate an incident to CWCL project management and the construction security control room. e The security companies can call upon a roaming supervisor to assist with a search and to seek further guidance if required. CWML security staff can assist CWCL site personnel in response to trespass activity to avert a risk to life or to prevent serious injury. In these circumstances the CWML security staff may enter the site at the invitation of a member of CWCL management or their nominated representative. This process is reliant on a nominated member of CWC staff 4 responding to a call and attending site prior to the plan being implemented. A safety briefing will be conducted detailing required Personal Protective Equipment, which will be provided by CWCL and site specific hazards. Any recommended control measure must be in place before any deployment of CWML security staff commences. They will be accompanied on site at all times by a member of CWCL site security or management. The final decision as to entry onto a CWCL construction site will rest with the CWML Security Duty Manager who must satisfy themselves that appropriate measures are in place to maximise the safety of security staff deployed. Security patrols must remain within the safe areas and (without additional protection measures) cannot venture beyond safety barriers or into hazardous areas where risk to life could occur in contravention to our duty of care. The following table outlines the specific actions to be taken by the construction security providers and the Canary Wharf Estate security in terms of communication and escalation. Table: Escalation Protocol for Site Trespass Action in priority order} | Responsible | Accountable Contact the police CWCL security CWCL Site This applies In every case of vla the 999 system provider Manager trespass onto a construction site regardless of whether the person/s are on site or have left. Trespass by unauthorised person/s onto a CWCL construction site Call the Estate Control Centre on 020 7418 2606 Call the Estate Contro! Centre on 020 7418 2606 Managing Director — Security Site security has not been breached but a person/s Is suspected of preparing to do so or attempting to do so. CWCL security provider Managing Director If there is any suspicion that an Intruder may have entered a site undetected In the interim period then the Estate Contro! Centre will be responsible for contacting the Police Head of Security - CWML Estate Control Centre to warn other CWCL sites ECC Control Head of Security — Centre Manager | CWML (incident detected by CWCL site security) Estate Control Centre to deploy CWML resources to Investigate ECC Control Centre Manager Site security has not been breached but a person/s Is suspected of preparing to do 80 or attempting to do so. (incident detected by CWML security) Estate Control Centre to deploy resources to investigate ECC Control Centre Manager Head of Security - CWML if there is any suspicion that an intruder may have entered a site undetected in the interim period then the Estate Control Centre will be responsible fer contacting the Police If confirmed attempt/preparation to breach site security to warn other CWCL sites ECC Contro! Centre Manager Head of Security — CWML Concern 3 - Torches used by the security guards The torches used by the security guards during night time patrol were Maglite 2 Cell torches. These torches are designed for harsh environments and used by the emergency services. Although they are believed to be sufficiently adequate and appropriate for night time patrols, the security guards now use a more powerful INFRAY flashlight, which has a beam distance of 240 metres and 800 lumens. Furthermore certain areas of the projects, such as walkways are constantly illuminated. Following the incident a lighting review was conducted to ensure all appropriate areas are lit.
See every Prevention of Future Deaths report matching Accident at Work and Health and Safety related deaths, and how often a new one appears.
What would an alert for this have sent me? Search the full text
Free to try — the preview shows the real matches and how many arrived in the last 12 months. Your first email alert is free.
These reports are published by the Chief Coroner's office at judiciary.uk and are © Crown copyright. The text here is reproduced from the published PDF so it can be searched. If something on this page is wrong, or you are a person named in it and want it reviewed, email drcjar@gmail.com and we will act promptly.