Prevention of Future Deaths reports · 2025

Jane Bennett

Regulation 28 report to prevent future deaths, reference 2025-0074, written 6 Feb 2025. A coroner writes one of these when an inquest reveals a risk that could cause further deaths unless something changes.

Date of report6 Feb 2025
Reference2025-0074
DeceasedJane Bennett
CoronerAnne Pember
Coroner areaNorthamptonshire
CategoryRoad (Highways Safety) related deaths
Sourcejudiciary.uk record · original PDF
Responses published1

The report

Text extracted from the PDF text layer. Reproduced verbatim, including the scan's own layout.

Regulation 28: REPORT TO PREVENT FUTURE DEATHS

NOTE: This form is to be used after an inquest.

REGULATION 28 REPORT TO PREVENT DEATHS

THIS REPORT IS BEING SENT TO:

1
2
3 Chief Coroner’s Office

1

CORONER

I am Anne PEMBER, Senior Coroner for the coroner area of Northamptonshire

2

CORONER’S LEGAL POWERS

I make this report under paragraph 7, Schedule 5, of the Coroners and Justice Act 2009
and regulations 28 and 29 of the Coroners (Investigations) Regulations 2013.

3

INVESTIGATION and INQUEST

On 19 March 2024 I commenced an investigation into the death of Jane BENNETT aged 65.
The investigation concluded at the end of the inquest on 09 January 2025.

The medical cause of death was given as:
1a
1b
2

Multiple organ failure
Severe trauma following road traffic collision.
Obesity, Type II Diabetes.

4

CIRCUMSTANCES OF THE DEATH

Mrs Bennett was a 65 year old lady. She drove her car on the 13th March 2024 at around
5pm when she exited the junction at St Johns Road, Tiffield travelling eastbound. She was
in collision with a vehicle travelling on the A43 in the direction of Northampton. Mrs
Bennett was conveyed to University Hospital Coventry and Warwick. Her condition
deteriorated. She was confirmed deceased on 15 March 2024.

5

CORONER’S CONCERNS

During the course of the investigation my inquiries revealed matters giving rise to concern.
In my opinion there is a risk that future deaths could occur unless action is taken. In the
circumstances it is my statutory duty to report to you.

The MATTERS OF CONCERN are as follows:
(brief summary of matters of concern)

The junction of St Johns Road, Tiffield and the A43 Northamptonshire is very difficult to
manoeuvre. Witnesses who attended at the inquest gave evidence to the effect that unless
some changes are made there are likely to be further accidents/or fatalities. I concur with
this view.

6

ACTION SHOULD BE TAKEN

Regulation 28 – After Inquest
Document Template Updated 30/07/2021

 In my opinion action should be taken to prevent future deaths and I believe you (and/or
your organisation) have the power to take such action.

7

YOUR RESPONSE

You are under a duty to respond to this report within 56 days of the date of this report,
namely by April 4th, 2025. I, the coroner, may extend the period.

Your response must contain details of action taken or proposed to be taken, setting out the
timetable for action. Otherwise you must explain why no action is proposed.
COPIES and PUBLICATION

8

I have sent a copy of my report to the Chief Coroner and to the following Interested
Persons

I have also sent it to

of Northamptonshire Police

who may find it useful or of interest.

I am also under a duty to send a copy of your response to the Chief Coroner and all
interested persons who in my opinion should receive it.

I may also send a copy of your response to any person who I believe may find it useful or
of interest.

The Chief Coroner may publish either or both in a complete or redacted or summary form.
He may send a copy of this report to any person who he believes may find it useful or of
interest.

You may make representations to me, the coroner, at the time of your response about the
release or the publication of your response by the Chief Coroner.

9

Dated: 06/02/2025

Anne PEMBER
Senior Coroner for
Northamptonshire

Regulation 28 – After Inquest
Document Template Updated 30/07/2021

Responses

1 response published against this report on judiciary.uk. A response is a body's written reply to the coroner's concerns; publication is at the discretion of the Chief Coroner's office, so an absent response does not mean nobody replied.

Response from National Highways (PDF)
REGULATION 29 RESPONSE TO A REPORT TO PREVENT FUTURE DEATHS 

THIS RESPONSE IS BEING SENT TO: 

1.  The  Senior  Coroner  for  the  coroner  area  of  Northamptonshire,  Anne 
Pember,  of  The  Guildhall,  St  Giles’  Square,  Northampton  NN1  1DE  in 
response to a ‘Regulation 28 Report to Prevent Future Deaths’ issued after 
an inquest into the death of Jane Bennett.   

1  NATIONAL HIGHWAYS 

I am 
, Regional Director, Midlands region, Operations Directorate, 
responding  on behalf of National Highways  Limited,  Bridge  House,  1 Walnut Tree 
Close, Guildford, SURREY, GU1 4LZ. 

2  CORONER’S MATTERS OF CONCERN 

The MATTERS OF CONCERN are as follows:–  

“The  junction  of  St  John’s  Road,  Tiffield,  and  the  A43  Northamptonshire  is  very 
difficult  to  manoeuvre.  Witnesses  who  attended  at  the  inquest  gave  evidence  to 
the  effect  that  unless  some  changes  are  made  there  are  likely  to  be  further 
accidents/or fatalities. I concur with this view.” 

3  DETAILS OF ACTION TAKEN 

i.  Difficulty in manoeuvring at junction 

National Highways undertakes regular maintenance activities on the road network 
to ensure the road network is as safe as possible for all road users.  

The  Midlands  trunk  and  motorway  network  managed  by  National  Highways  is 
assessed on an annual basis using the latest 5 years personal injury collision data 
collated  by  the  Police  and  verified  by  DfT.   This  assessment  is  used  to  identify 
those locations with the highest incidents of personal injury collisions (PIC) so they 
can  be  prioritised  for  further  detailed 
investigations  and  potential  safety 
improvements.  The  latest  assessment  of  the  PIC  data  has  recently  been 
completed using the most up-to-date 5 years of data available (2019-2023).  

Following the fatal incident National Highways has referred to this assessment list 
and  the  junction  of  the  A43  /  St  John’s  Road  does  not  appear  within  the  top  100 
sites in the Midlands.  Although this data does not include the recent fatality it does 
reveal  that  this  junction  has  a  relatively  good  safety  record  in  relation  to  the 
Midlands  trunk  and  motorway  network,  with  only  two  ‘slight’  injury  collisions 
recorded here within that 5 year period. Based on this, the junction of the A43 and 
St  John’s  Road  does  not  rank  highly  as  a  safety  problem  location,  and  for  this 
reason  we  have  not  prioritised  this  junction  as  a  location  to  undertake  detailed 
investigations for a potential safety improvement scheme. 

1 

 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 National Highways currently have a renewals scheme programmed for 2026/2027 
which includes resurfacing, road markings, road studs, vegetation clearance, and 
drainage for sections of the A43 including St John’s junction. 

4  DETAILS OF FURTHER ACTION PROPOSED 

i.  Difficulty in manoeuvring at junction 

In  advance  of  the  2026/2027  planned  carriageway  renewals  scheme,  National 
Highways  is  planning  minor  surfacing  works  for  Summer  2025.  This  will  include 
refreshing road markings and reflective road studs on the A43 eastbound mainline 
through the junction. We are currently investigating the possibility of including the 
vegetation clearance in these works. 

The vegetation clearance works should improve manoeuvrability at the junction by 
increasing  visibility  which  will  make  it  easier  for  drivers  exiting  St  John’s  Road  to 
identify gaps in the traffic on the A43 to safely negotiate the junction. 

ii. 

Future Planned Works 

The  A43  renewals  scheme  is  currently  being  developed  and  scheduled  for 
construction in the later part of 2026.  This scheme involves resurfacing of the A43 
eastbound  and  westbound  carriageway,  repainting  of  the  line  markings  and 
replacing  the  reflective  road  studs  from  the  M1  motorway  through  to  St  John’s 
Road junction. While the physical layout of the junction will not change, as part of 
our  scoping  we  are  investigating  potential  improvements  for  the  junction  of  St 
John’s Road, such as signage. 

5 

TIMETABLE FOR ACTION 

DATE     

ACTION 

Planned 
for 
Summer 
2025 
Planned 
for Late 
2026 

Minor carriageway repair works. 
Vegetation clearing in A43 central reserve. 
Vegetation clearing in A43 verge adjacent St John’s Road junction 

Northbound and southbound carriageway resurfacing works from 
M1 motorway to St John’s Road junction. 

6 

SAFETY OF ROAD USERS 

The  safety  of  everyone  on  our  road  network  matters;  it  is  an  imperative  for  our 
business in what we set out to achieve and a core value of our organisation in how 
we go about it.  

The  action  taken  and  planned  on  the  A43  is  designed  to  ensure  we  maintain  the 
road network to ensure efficient and safe movement for all road users and should 
help to prevent future deaths at this location.  

2 

 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 7 

Date: 31 03 2025 

Signed: 

, Regional Director, Midlands region 

3

Related reports

Other reports by Anne Pember

See all →

More reports categorised “Road (Highways Safety) related deaths”

See all →

Track Road (Highways Safety) related deaths

See every Prevention of Future Deaths report matching Road (Highways Safety) related deaths, and how often a new one appears.

What would an alert for this have sent me? Search the full text

Free to try — the preview shows the real matches and how many arrived in the last 12 months. Your first email alert is free.

These reports are published by the Chief Coroner's office at judiciary.uk and are © Crown copyright. The text here is reproduced from the published PDF so it can be searched. If something on this page is wrong, or you are a person named in it and want it reviewed, email drcjar@gmail.com and we will act promptly.