Prevention of Future Deaths reports · 2025

Freddie Slater

Regulation 28 report to prevent future deaths, reference 2025-0204, written 16 Apr 2025. A coroner writes one of these when an inquest reveals a risk that could cause further deaths unless something changes.

Date of report16 Apr 2025
Reference2025-0204
DeceasedFreddie Slater
CoronerAlan Blunsdon
Coroner areaNorth West Kent
CategoryRoad (Highways Safety) related deaths
Sourcejudiciary.uk record · original PDF
Responses published1

The report

Text extracted from the PDF text layer. Reproduced verbatim, including the scan's own layout.

Mrs North West Kent Coroners' Service 
Oakwood House 
Oakwood Park 
Maidstone 
Kent 
ME16 8AE 
Telephone:  03000 410502 

Email: 

Date: 16 April 2025 

Case: 

REGULATION 28 REPORT TO PREVENT FUTURE DEATHS 

THIS REPORT IS BEING SENT TO:  The Chief Coroner, National Highways, 

; Kent Police. 

1. CORONER 

I am His Honour Alan James Blunsdon, Assistant Coroner  for the Coroner area of North West 
Kent.  

2. CORONER'S LEGAL POWERS 

I make this report under paragraph 7, Schedule 5, of the Coroners and Justice Act 2009 and 
regulations 28 and 29 of the Coroners (Investigations) Regulations 2013. 

http://www.legislation.gov.uk/ukpga/2009/25/schedule/5/paragraph/7 

http://www.legislation.gov.uk/uksi/2013/1629/part/7/made 

 
  
   
 
  
  
  
  
  
 3. INVESTIGATION and INQUEST 

On 18 October 2024 I commenced an investigation into the death of Freddie SLATER. The 
investigation concluded at the end of the inquest on the 9th April 2025. The conclusion of the 
inquest was 

Road Traffic Collision 

The medical cause of death was recorded as: 

1a   Hypovolemic Shock with Multiorgan Failure 

1b   Massive Internal Haemorrhage from Visceral Injuries 

1c   Polytrauma from Road Traffic Collisions 

 II    Severe Left Ventricular Hypertrophy with Congestive Cardiac Failure 

4. CIRCUMSTANCES OF THE DEATH 

At about 06.19 hours on Wednesday 16th October 2024,the Deceased was driving his Smart 
car to work travelling coastbound on the M20 motorway in Kent. He was unaccompanied and 
travelling in lane 2 of the 3 lane carriageway. He was following a Vauxhall Mokka car (Mokka) 
also travelling in lane 2. The vehicles were at or about Junction 1 at the Swanley interchange. 

The Deceased was travelling slightly faster than the Mokka vehicle and upon catching up with 
the Mokka. There was a collision between the front and front nearside of the Smart vehicle 
driven by the Deceased and the rear and rear offside of the Mokka. The impact caused both 
vehicles to rotate at speed. The Mokka was brought under control and stopped. The Smart car 
driven by the Deceased continued over the grass verge which separates the main carriageway 
of the M20 from the M25/M20, 2 carriageway slip road.   The slip road carries traffic joining the 
M20 southbound from the M25 and is subject to the national speed limit of 70MPH. 

On crossing the grass verge the Smart car driven by the Deceased entered the slip road and 
was in collision with a BMW vehicle travelling in lane 2 of the slip road intending to join the 
M20 Motorway coastbound. The Smart car then travelled further in the eastbound direction re-
entering the M20 in lane 1, stopping partly in lane 1 and the hard shoulder. As a result of 
injuries sustained in the collisions Mr Slater sadly died at the scene. 

  
  
  
  
 5. CORONER'S CONCERNS 

During the course of the inquest the evidence revealed matters giving rise to concern. In my 
opinion there is a risk that future deaths will occur unless action is taken. In the circumstances 
it is my statutory duty to report to you. 

The MATTERS OF CONCERN are as follows.  - 

(1) The grass verge which separates the M20 and M25/ M20 slip road does not have erected 
upon it any physical barriers to prevent traffic crossing the verge from either of the 2 roads 
referred to and entering a parallel lane the opposite side of the verge. 

(2) The evidence received from National Highways confirmed that under the present policy 
guidance, barriers would not normally be required as there are no features such as an incline 
on the slip road, bridge supports or trees requiring physical protection between the two 
merging roads of traffic travelling at similar speeds in the same direction. 

(3) The facts of the present case illustrate that in the event of a loss of control of a vehicle 
travelling on either the M20 or in the slip road there is the potential for that vehicle, without any 
warning to drivers travelling at or about the same area in the coastbound direction, cross the 
grass verge to their side and enter their lane of travel. As both the material roads are subject 
to the same national speed limit of 70MPH, the risk of a high speed collision and fatality arises. 

6. ACTION SHOULD BE TAKEN 

In my opinion action should be taken to prevent future deaths and I believe you National 
Highways have the power to take such action. 

7. YOUR RESPONSE 

You are under a duty to respond to this report within 56 days of the date of this report, namely 
by 12th June 2025. I, the coroner, may extend the period. 

Your response must contain details of action taken or proposed to be taken, setting out the 
timetable for action. Otherwise you must explain why no action is proposed. 

8. COPIES and PUBLICATION 

I have sent a copy of my report to the Chief Coroner and to the following Interested Persons 
  I have also sent it to Kent Police who may find it useful or of interest. 

I am also under a duty to send the Chief Coroner a copy of your response. 

The Chief Coroner may publish either or both in a complete or redacted or summary form. He 
may send a copy of this report to any person who he believes may find it useful or of interest. 
You may make representations to me, the coroner, at the time of your response, about the 
release or the publication of your response by the Chief Coroner. 

  
  
  
  
  
  
  
 16 April 2025 

Signature 

Alan Blunsdon Assistant Coroner for North West Kent

Responses

1 response published against this report on judiciary.uk. A response is a body's written reply to the coroner's concerns; publication is at the discretion of the Chief Coroner's office, so an absent response does not mean nobody replied.

Response from National Highways (PDF)
REGULATION 28 RESPONSE TO PREVENT FUTURE DEATHS 

THIS RESPONSE IS BEING SENT TO: 

The Assistant Coroner for North West Kent, His Honour Alan James Blunsdon of Oakwood House, 
Oakwood Park, Maidstone, Kent, ME16 8AE. 

National Highways  

I am 
of Viables 3, Jays Close, Basingstoke RG22 4BS. 

, Head of the Vehicle Restraint Systems Team at National Highways Limited 

CORONER’S MATTERS OF CONCERN  

The MATTERS OF CONCERN are as follows: –  

(1) The grass verge which separates the M20 and M25/ M20 slip road does not have erected 
upon it any physical barriers to prevent traffic crossing the verge from either of the 2 roads 
referred to and entering a parallel lane the opposite side of the verge. 

(2) The evidence received from National Highways confirmed that under the present policy 
guidance, barriers would not normally be required as there are no features such as an incline 
on the slip road, bridge supports or trees requiring physical protection between the two 
merging roads of traffic travelling at similar speeds in the same direction. 

(3) The facts of the present case illustrate that in the event of a loss of control of a vehicle 
travelling on either the M20 or in the slip road there is the potential for that vehicle, without any 
warning to drivers travelling at or about the same area in the coastbound direction, cross the 
grass verge to their side and enter their lane of travel. As both the material roads are subject 
to the same national speed limit of 70MPH, the risk of a high speed collision and fatality arises. 

DETAILS OF ACTION TAKEN  

This note has been prepared in response to a Regulation 28 report, received from the North West 
Kent Coroner’s Service by National Highways in response to a fatal road traffic collision on 16 
October 2024. The incident occurred in the proximity of the link road connecting the M25 junction 
3 southbound carriageway to the M20 eastbound carriageway. 

Nature of the current barrier provision at the material location 

The current barrier provision at the incident location is unchanged from the time of the incident; 
prior to the Button Street overbridge, there is a barrier in the nearside verge of the entry slip road 
to the M20 from the Farningham roundabout (i.e. located between the Farningham roundabout entry 
slip road and the M25 entry slip road).  

Initially,  this  barrier  takes  the  form  of  two  single  sided  lengths  of  Tensioned  Corrugated  Beam 
(TCB) barrier. These have been installed to reduce the risk of injury to a road user from impacting 
the trees  between  the  barriers  and to reduce the risk of injury posed by the difference in height 
between the two carriageways.  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 When there are no trees between the two slip roads, and the difference in height between the two 
slip roads presents no/little risk of injury, the barrier transitions into a double sided TCB barrier to 
close the gap which would otherwise have been left between the two lengths of single sided barrier, 
and the next length of barrier.  

Shortly, prior to the bridge pier supporting Button Street, the double sided TCB bifurcates (forming 
a Y-shape) into two single sided lengths of TCB.  

These lengths of single sided TCB are then transitioned into two lengths of single sided Open Box 
Beam (OBB) barrier which are then aligned around each side of the bridge pier. This is to reduce 
the risk of injury to a road user from impacting the bridge pier.  

Each length of the single sided OBB is then terminated after the bridge pier with an end terminal.  

Additional lengths of barrier are not provided after the bridge pier at the material location as there 
are no further hazards after the bridge pier; the height difference between the two carriageways is 
negligible, and there are no physical hazards present within the grass strip, such as a bridge pier, 
tree, lighting column or sign post.  

A  review  of  the  current  barrier  provision  at  this  locality  with  reference  to  current 
requirements 

National  Highways’  current  requirements  for  road  restraint  systems  (including  barriers)  are 
contained within the document CD 377 – Requirements for Road Restraint Systems. These were 
first  published  in  March  2020,  with  the  latest  revision  (revision  4)  published  in  January  2021 
(https://www.standardsforhighways.co.uk/search/1fe48581-82ba-4b6f-95a1-ee93309bd1b5). 

As identified in paragraph 5(2) of the Regulation 28 report, current design requirements would not 
require a barrier to be erected within the grassed medium between the M25 link and the M20 link. 

An assessment using the National Highways’ Road Restraint Risk Assessment Process (RRRAP) 
has been undertaken, and that has confirmed the merge arrangements do not constitute a hazard that 
would require protection by a barrier as traffic travelling down the M25 entry slip road and the main 
carriageway of the M20 are travelling in the same direction. 

The RRRAP identified that current design requirements would require a full height barrier to extend 
7.5  metres  beyond  the  Button  Street  bridge  pier  (as  the  bridge  pier  is  identified  as  the  hazard 
requiring protection). 

The existing length of barrier at full height beyond the Button Street bridge pier is approximately 
16.8 metres in the nearside verge of the M20, and approximately 9.6 metres in the offside verge of 
the M25 entry slip road. Hence both lengths of barrier beyond the Button Street bridge pier exceed 
the minimum requirement of National Highways’ current design requirements. 

It is also confirmed that the containment level of the barrier in front of the Button Street bridge pier 
is compliant with current requirements.  If it had been identified that a greater level of containment 
was required, this would have required longer lengths of barrier after the bridge pier (in order to 
accommodate the containment level of the system).  Again, this is not the case and both lengths of 
barrier  beyond  the  Button  Street  bridge  pier  exceed  the  minimum  requirement  of  National 
Highways’ current design requirements. 

 
 
 
 
 
 
 
 
 
 
 
 Barriers  present  a  level  of  injury  risk  to  road  users  and  are therefore  only  installed in  locations 
where a hazard cannot be removed, relocated, or made frangible, and the level of injury risk from 
the barrier is lower than the level of injury risk posed by the hazard located behind the barrier.  

Barriers also require installation, inspection, maintenance, repair and removal, all of which present 
a level of risk to our roadworkers, but also to the travelling public whilst temporary lane closures 
and speed restrictions may be in place to undertake such works. 

A review of similar incidents on the National Highways Strategic Road Network (SRN). 

A review of fatal incidents on the whole of the SRN in England has been undertaken to identify any 
other incidents where a vehicle has crossed over a strip at the end of the nosing at an on-slip road 
and impacted a vehicle on the adjacent slip road.  This search has been limited to fatal incidents as 
there is typically insufficient detail available for serious, slight and damage-only incidents in order 
to make a detailed assessment of the circumstances of the incident. 

The review of fatal incidents has identified a single event between 2014 and 2022 on the SRN, 
however in that incident, the fatality occurred to a member of the public who had left their vehicle 
due to a previous minor incident on the main carriageway. 

As a result, it is concluded that such incidents are uncommon on the SRN. 

A review of incidents at this locality 

A review of incidents in this locality has identified a single unrelated incident within the five year 
period from 1 October 2019 to 30 September 2024. The incident recorded was a ‘slight’ personal 
injury and from the description provided by the police, the road infrastruture (or lack of) was not a 
factor in this incident, and occurred in advance of the link road merge. 

TIMETABLE FOR PLANNED ACTION  

No further action is planned. 

SAFETY OF ROAD USERS  

The safety of our road users is an imperative for our business, and safety is a core value of our 
organisation. We are working hard to make our entire network safer.  

We consider that the action we have taken to date has confirmed that the length of barrier after the 
Button Street bridge piers meets current requirements.   

We have also identified that the circumstances witnessed in this incident are uncommon elsewhere 
on the SRN.   

Furthermore, we have also identified a single unrelated incident (of a slight personal injury) at this 
location (albeit in advance of the link road merge) within the five year period from 1 October 2019 
to 30 September 2024.   

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 We have also highlighted that barriers present a level of injury risk to road users and are therefore 
only installed in locations where a hazard cannot be removed, relocated, or made frangible, and the 
level of injury risk from the barrier is lower than the level of injury risk posed by the hazard located 
behind the barrier.  

All improvements to the SRN are required to be progressed in a considered and controlled fashion 
so that the consequences of changes to the SRN are fully understood and any linked safety risks are 
eliminated or reduced as far as possible. Furthermore, works to the SRN are required to demonstrate 
value for money, in accordance with the Highways England: Licence (April 2015), and our duty to 
manage public funds. 

As a result, it is not our intention to take any further action at this location, nor is it our intention to 
update the requirements for barriers at merges within CD 377 as a direct result of this incident. 

7  Signed and dated 

, 11th June 2025

Related reports

Other reports by Alan Blunsdon

See all →

More reports categorised “Road (Highways Safety) related deaths”

See all →

Track Road (Highways Safety) related deaths

See every Prevention of Future Deaths report matching Road (Highways Safety) related deaths, and how often a new one appears.

What would an alert for this have sent me? Search the full text

Free to try — the preview shows the real matches and how many arrived in the last 12 months. Your first email alert is free.

These reports are published by the Chief Coroner's office at judiciary.uk and are © Crown copyright. The text here is reproduced from the published PDF so it can be searched. If something on this page is wrong, or you are a person named in it and want it reviewed, email drcjar@gmail.com and we will act promptly.