Prevention of Future Deaths reports · 2025

Alexander Thomas

Regulation 28 report to prevent future deaths, reference 2025-0029, written 16 Jan 2025. A coroner writes one of these when an inquest reveals a risk that could cause further deaths unless something changes.

Date of report16 Jan 2025
Reference2025-0029
DeceasedAlexander Thomas
CoronerAdrian Farrow
Coroner areaManchester South
CategoryRoad (Highways Safety) related deaths · Suicide (from 2015)
Sourcejudiciary.uk record · original PDF
Responses published1

The report

Text extracted from the PDF text layer. Reproduced verbatim, including the scan's own layout.

REGULATION 28 REPORT TO PREVENT FUTURE DEATHS 

THIS REPORT IS BEING SENT TO: 

1.  THE CHIEF EXECUTIVE, NATIONAL HIGHWAYS 

1 

CORONER 

I am Adrian Farrow, Hm Assistant Coroner, for the coroner area of Greater Manchester 
South 

2 

CORONER’S LEGAL POWERS 

I make this report under paragraph 7, Schedule 5, of the Coroners and Justice Act 2009 
and Regulations 28 and 29 of the Coroners (Investigations) Regulations 2013. 

3 

INVESTIGATION and INQUEST 

On 15th August 2024 an investigation was commenced into the death of Alexander 
Charles Edward Thomas, aged 42. The investigation concluded at the end of the inquest 
on 13th January 2025. The conclusion of the inquest was that he died from multiple 
injuries consistent with a road traffic collision when he committed suicide. 

4 

CIRCUMSTANCES OF THE DEATH 

Mr Thomas died on 14th August 2024 when he entered the eastbound carriageway of 
the M56 motorway between junctions 
. A heavy goods vehicle collided with him 
when  he  deliberately  stood  in  its  path  and  he  sustained  fatal  injuries.  He  had  a 
longstanding diagnosis of depressive disorder. 
The  location  of  the  collision  was  close  to  where 
motorway and the nearby premises and car parks of the 
and the evidence was that Mr Thomas had entered the motorway from the 
area. 
CORONER’S CONCERNS 

  passes  under  the  M56 

5 

During the course of the inquest the evidence revealed matters giving rise to concern. In 
my opinion there is a risk that future deaths could occur unless action is taken. In the 
circumstances it is my statutory duty to report to you. 

The MATTERS OF CONCERN are as follows.  –  

  is  a  pedestrian  walkway  running     

1.  During  the  inquest,  I  heard  that 
underneath  the  M56  motorway.  On  the  northern  side  of  the  motorway  (eastbound 
carriageway side) the entrance to the walkway tunnel is constructed so that the buttress 
walls  form a  ramp-like  structure  which  has a  shallow  gradient topped  with  a  waist-high 
railing which provides an easily accessible and walkable route from the footpath to the 
Armco  crash  barrier  bordering 
the  hard  shoulder  of  the  eastbound  motorway 
carriageway.  
2.  Also  leading  from 
  is  an  established  track  through  undergrowth  running 
west parallel to the motorway. That path  leads directly to a fixed bespoke  metal ladder 
which appears to be specifically positioned so as to enable a person to climb up to the 
Armco crash barrier bordering the hard shoulder of the eastbound carriageway.  
3. There is no fencing to prevent access over the Armco crash barrier onto the motorway 
itself  along  this  stretch  of  the  eastbound  carriageway,  in  contrast  to  the  substantial 
fencing  positioned  behind  the  Armco  crash  barrier  along  the  opposite  stretch  of  the 
westbound carriageway. 

1 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ACTION SHOULD BE TAKEN 

In my opinion action should be taken to prevent future deaths and I believe your 
organisation has the power to take such action.  

7 

YOUR RESPONSE 

You are under a duty to respond to this report within 56 days of the date of this report, 
namely by 13th March 2025. I, the coroner, may extend the period. 

Your response must contain details of action taken or proposed to be taken, setting out 
the timetable for action. Otherwise, you must explain why no action is proposed. 

8 

COPIES and PUBLICATION 

I  have  sent  a  copy  of  my  report  to  the  Chief  Coroner  and  to  the  following  Interested 
Person Mr Thomas’ brother on behalf of Mr Thomas’ family. I have also sent it to Chief 
Superintendent, Greater Manchester Police Roads Policing Unit, who may find it useful 
or of interest. 

I am also under a duty to send the Chief Coroner a copy of your response.  

The  Chief  Coroner  may  publish  either  or  both  in  a  complete  or  redacted  or  summary 
form. He may send a copy of this report to any person who he believes may find it useful 
or  of  interest.  You  may  make  representations  to  me,  the  coroner,  at  the  time  of  your 
response, about the release or the publication of your response by the Chief Coroner. 

9 

Adrian Farrow 
HM Assistant Coroner 

16th January 2025 

2 

 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 3

Responses

1 response published against this report on judiciary.uk. A response is a body's written reply to the coroner's concerns; publication is at the discretion of the Chief Coroner's office, so an absent response does not mean nobody replied.

Response from National Highways (PDF)
Our ref:  
Your ref: 

Adrian Farrow 
HM Assistant Coroner 
HM Coroner Manchester South 
Coroners Court 
11 Mount Tabor Street 
Stockport 
SK1 3AG 

Operations Regional Director  
Piccadilly Gate 
Store Street 
Manchester 
M1 2WD 

www.nationalhighways.co.uk 

13 March 2025 

Dear Mr Farrow 

Regulation 28 Report into the death of Alexander Charles Edward Thomas  

Thank you for your correspondence dated 16/01/2025. 

The M56 motorway at this point spans Hasty Lane which forms an underpass to facilitate 
access by cyclists and pedestrians. The structural supports and cast concrete wing walls 
mirror the profile of the embankments on either side of the motorway and are located within 
the  highway  boundary.  This  design  of  ‘bridge’  complies  with  the  design  requirements 
outlined within the Design Manual for Roads and Bridges and includes tubular railings to 
protect against falls from the structure. It is accepted that this type of design does not deter 
determined  attempts  by  pedestrians  to  gain access  to  the  motorway  but  when  combined 
with timber boundary fence provides some deterrence and security. By the very nature of 
the Strategic Road Network, it is impossible to fully deny access. 

Whilst there are no requirements for highway authorities to fence their boundaries, as this 
responsibility  generally  rests  with  landowners,  National Highways  recognises  the  specific 
hazards  associated  with  the  operation  of  motorways  and  provides  boundary  fencing 
generally  located  to  reflect  the  legal separation  of  adjacent  land.  This normally  takes  the 
form of 1 metre high timber post and rail fencing although more specialised types of fence 
are used for specific purposes for example, to address the presence of deer or other hazards 
and minimise environmental impacts. 

To the east of the motorway, along the southbound carriageway, the extents of the boundary 
line are clearly marked by timber fencing as outlined above. This extends along the wing 
walls of the structure and this would be the ideal, and normally achieved, layout. Additionally, 
along  this  section,  a  timber  environmental  barrier  is  installed  at  the  top  of  the 

Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ 
National Highways Limited registered in England and Wales number 09346363 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 embankment/verge.  We  believe  this  is  the  substantial  wooden  fence  referred  to  in  the 
Coroner’s concerns.  

Along the northbound carriageway and to the south of Hasty Lane, the M56 carriageway is 
some  3  metres  higher  than  the  adjacent  ground  level  and  initially  has  a  ramped  profiled 
embankment. After a distance of 12 metres, the profiled verge area becomes a near vertical 
retaining wall which continues for some distance. This also creates a level area of ground, 
running parallel to the motorway between the retaining wall and boundary fence. Between 
the retaining wall on one side and the boundary fence and mature vegetation on the other, 
this gives the visual impression of a pathway. 

The  M56  at  this  point  is  lit  with  lighting  columns  located  within  the  area  of  carriageway 
immediately behind the hard shoulder. This includes columns installed within the top of the 
verge/embankment and the top of the retaining structure. The electrical supply required to 
operate  this  system  is  distributed  from  electrical  feed  cabinets  located  at  the  foot  of  the 
retaining wall. Maintenance personnel require unhindered access to, not only the individual 
lighting columns, but also these supply cabinets to safely work on the systems when needed. 
A  set  of  metal  steps  (ladder)  allow  access  for  maintenance  personnel  to  and  from 
carriageway  level  and  the  flat  ground  some  2  metres  below.  This  is  within  the  fenced 
highway boundary.  

The boundary fence alongside the northbound carriageway to the south of Hasty Lane has 
suffered some level of vandalism in the immediate area of the underpass and although there 
is some dense vegetation, this affords access to the side of the carriageway and metal steps 
outlined above.  

Additionally, it appears that a boundary fence line has never been in place along the wing 
walls on this side of the structure and Hasty Lane. Further investigation has identified some 
minor vandalism at the edge of the car park for the Marriot Hotel, 100 yards south of Hasty 
Lane. This indicates the section of lane between the retaining wall and boundary fence has 
been used as short cut or cut through although the usage appears to be light. 

Our current incident recording system was implemented during April 2019. Since this time 
we are not aware of any similar, pedestrian related, incidents having been recorded at this 
site. 

We will repair the boundary fence both at the edge of the hotel car park and Hasty Lane, 
extending this to cover the wing walls of the structure to increase the security and reduce 
access to the area along the carriageway. This work will be completed by the 30 June 2025. 

In addition, we are in discussion with our  Electrical team and Maintenance contractors to 
establish  if  it  is  feasible  to  maintain  a  more  remote  access  to  the  electrical  cabinets  and 
whether  direct  access  from  the  mainline  carriageway,  via  the  ladder  is  essential.  This 
includes the relevant health and safety requirements and if this can be resolved we will take 
steps to remove the ladder from the retaining wall. Again, if this is feasible the work will be 
completed by 30 June 2025. 

Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ 
National Highways Limited registered in England and Wales number 09346363 

 
 
 
 
 
 
 
 
 
 If this is not a realistic way forward, we will undertake to design and install a bespoke fence 
assembly  to  secure  the  access  point,  cabinets  and  ladder.  If  this  course  of  action  is 
necessary, the work will be completed by the 31 August 2025.  

I hope that you find this information helpful. 

Yours sincerely 

Operations Regional Director 
Email: 

Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ 
National Highways Limited registered in England and Wales number 09346363

Related reports

Other reports by Adrian Farrow

See all →

More reports categorised “Road (Highways Safety) related deaths”

See all →

Track Road (Highways Safety) related deaths

See every Prevention of Future Deaths report matching Road (Highways Safety) related deaths, and how often a new one appears.

What would an alert for this have sent me? Search the full text

Free to try — the preview shows the real matches and how many arrived in the last 12 months. Your first email alert is free.

These reports are published by the Chief Coroner's office at judiciary.uk and are © Crown copyright. The text here is reproduced from the published PDF so it can be searched. If something on this page is wrong, or you are a person named in it and want it reviewed, email drcjar@gmail.com and we will act promptly.